Full kitchen gut & rebuild
Load-bearing wall removed, plumbing and gas relocated, rebuilt with custom cabinetry in six weeks.
Our work
Every project is a before-and-after pair. Wipe between them, or switch any project — or the whole page — to side-by-side.
8 projects shown
Load-bearing wall removed, plumbing and gas relocated, rebuilt with custom cabinetry in six weeks.
900 sq ft of containment and full drywall replacement. Passed clearance on the first test.
Rotted 1990s deck torn out and re-footed to frost depth; 620 sq ft of western red cedar.
Negative grade corrected, French drain installed, finished with an 800 sq ft paver patio.
On site in 90 minutes, dried to standard in four days, two ceilings and a kitchen rebuilt.
Full-house assessment, abatement of original trim and 22 replacement windows. Cleared first pass.
Full envelope replacement: architectural shingle roof, fiber cement siding, new gutters.
Unfinished basement turned into legal living space with egress window, full bath and wet bar.
Free estimate